Earthwork Determinations
Exact determinations of the volume of earthworks based on precise surveying measurements are used for the calculation or the review of earthwork reckonings. The intersection of the topographical altitude measurement of the original site with the measurement of the site after the earth movement activities have been completed allows for an exact calculation of the shifted cubic meters of earth (cut and fill volumes).
Similarly, an earthwork balance can be calculated on the basis of the planning through splitting after the adding and removal of earth. The result is a digital 3D terrain model that we will be happy to feed into the machine control system of earthmoving machinery.